Oregon Revised Statutes
Chapter 537 — Appropriation of Water Generally
229 sections
As used in this chapter, “Water Rights Act” means and embraces ORS 536.050, 537.120, 537.130, 537.140 to 537.252, 537.390 to 537.400, 538.420, 540.010 to 540.120, 540.210 to 540.230, 540.310 to 540.430, 540.443 to 540.491, 540.505 to 540.586 and 540.710 to 540.750.
PUBLIC AGENCY WATER USE REGISTRATION
In lieu of applying for a permit for a water right under ORS 537.130, a public agency having jurisdiction over roads or highways may register a water use for road and highway maintenance, construction and reconstruction purposes.
A public agency applying to register a water use under subsection (1) of this section shall:
Submit a completed application to r…
The provisions of this chapter relating to appropriation and water rights do not apply to the production of fluid from a well with a bottom hole temperature of at least 250 degrees Fahrenheit.
Production of fluids from a well with a bottom hole temperature of at least 250 degrees Fahrenheit shall be regulated as a geothermal resource under the applicable se…
If interference between an existing geothermal well permitted under ORS chapter 522 and an existing water appropriation permitted under this chapter is found by either the State Geologist or the Water Resources Commission, the State Geologist and the Water Resources Commission shall work cooperatively to resolve the conflict and develop a cooperative managem…
As the Water Resources Commission updates its water right and permit records with current land ownership information from county records or other sources, the commission shall request the person shown in those updated records to verify that the person owns the land to which a water right or permit is appurtenant.
Any person receiving a request under subsect…
Except as provided in subsection (3) of this section, any governmental entity that holds a water right shall submit an annual water use report to the Water Resources Department. The report shall include, but need not be limited to the amount of water used by the governmental entity, the period of use and the categories of beneficial use to which the water is…
If the Water Resources Department requires an entity to measure the use of water diverted, stored or otherwise appropriated by the entity under a right established by a water right permit, water right certificate, limited license, decree, order of determination or ground water registration, the department may require the entity to report the measured use to …
All water within the state from all sources of water supply belongs to the public.
Subject to existing rights, and except as otherwise provided in ORS chapter 538, all waters within the state may be appropriated for beneficial use, as provided in the Water Rights Act and not otherwise; but nothing contained in the Water Rights Act shall be so construed as to take away or impair the vested right of any person to any water or to the use of a…
Except for a use exempted under ORS 537.040, 537.141, 537.142, 537.143 or 537.800 or under the registration system set forth in ORS 537.132, any person intending to acquire the right to the beneficial use of any of the surface waters of this state shall, before beginning construction, enlargement or extension of any ditch, canal or other distributing or cont…
As used in ORS 537.132, 540.510 and 540.610, “reclaimed water” means water that has been used for municipal purposes and after such use has been treated in a treatment works as defined in ORS 454.010, and that, as a result of treatment, is suitable for a direct beneficial purpose or a controlled use that could not otherwise occur.
Note: 537.131 was added to…
The provisions of ORS 537.130 requiring application for a permit to appropriate water shall not apply to the use of reclaimed water, if:
The use of reclaimed water is authorized by the national pollutant discharge elimination system or water pollution control facilities permit issued pursuant to ORS 468B.050 or 468B.053;
The Department of Environmental Qua…
A permittee may not enter upon forestland adjacent to the point of diversion designated in the permit until such person provides notice to the landowner of the permittee’s intention to enter upon such property. The notice shall:
Be in writing;
Be mailed to the landowner 30 days prior to the commencement of any construction, maintenance or repair work; and
…
The appropriation of water for the purpose of recharging ground water basins or reservoirs is declared to be for a beneficial purpose. Permits for such appropriation may be granted by the Water Resources Department on application made therefor. Any such application shall substantially comply with ORS 537.140 and shall be subject to the provisions of ORS 537.…
The failure of an applicant to obtain written authorization, obtain an easement or acquire ownership of land if required as a condition to issuance of a permit under ORS 537.211 (2) shall be a ground for refusal to issue a permit.
If an applicant makes a statement under ORS 537.140 (1)(a)(E) that falsely states that the applicant owns all lands crossed by a…
Each application for a permit to appropriate water shall be made to the Water Resources Department on a form prescribed by the department and shall set forth:
The name and mailing address of the applicant;
The source of water supply including the name and mailing address of any owner of the land upon which the source of the water supply is located;
The na…
The following water uses do not require an application under ORS 537.130 or 537.615, a water right permit under ORS 537.211 or a water right certificate under ORS 537.250:
Emergency fire-fighting uses;
Nonemergency fire-fighting training, provided:
The source of the water is existing storage and the use occurs with permission of the owner of the stored wa…
No water right certificate or permit is required for the use of the surface waters of this state if
the water is to be used for a salmon and trout enhancement project certified by the State Department of Fish and Wildlife under ORS 496.430 to 496.460.
The use of water for a salmon and trout enhancement project under subsection (1) of this section is a bene…
Notwithstanding the provisions of ORS 537.130, the Water Resources Commission may establish by rule a procedure to allow a person to obtain a limited license to use or store ground water not otherwise exempt under ORS 537.545, to use or store surface water, to use stored water or to use stored water for purposes for which the stored water is authorized and i…
Any person requesting the right to use water under a limited license under ORS 537.143 shall notify the Water Resources Department on a form provided by the department.
If the request submitted under subsection (1) of this section is to use stored water for purposes for which the stored water is authorized and pursuant to a contract between the user and a l…
If an application is made for a permit to appropriate water for hydroelectric purposes, the Water Resources Department shall give written notice of the filing of the application to the owner of any land that is:
Adjacent to any portion of the stream in which the quantity of water will be decreased by the project; or
Adjacent to the site of the proposed hyd…
Notwithstanding the process for applying for a water right permit established in ORS 537.150 to 537.230, a person may, pursuant to this section, apply to the Water Resources Department for a water right permit to use stored water. A person applying under this section for a water right permit to use stored water shall submit:
A fee, in the amount required by…
Within 15 days after receiving an application, the Water Resources Department shall determine whether the application contains the information listed under ORS 537.140 (1) and is complete and not defective, including the payment of all applicable fees or fee amounts required under ORS 537.140 (5).
If the department determines that the application is incompl…
Within 60 days after the Water Resources Department proceeds with the application under ORS 537.150 (5)(c), the department shall complete application review and issue a proposed final order approving or denying the application or approving the application with modifications or conditions. The department may request the applicant to provide additional informa…
Subject to the provisions of subsections (2) and (3) of this section, and of ORS 537.170 and 537.190, the Water Resources Department shall approve all applications made in proper form which contemplate the application of water to a beneficial use, unless the proposed use conflicts with existing rights.
The department may not approve an application for a per…
If a protest of a proposed final order issued under ORS 537.153 is filed under ORS 536.077 and, after the contested case hearing or, if a hearing is not held, after the close of the period allowed to file a protest, the Water Resources Director determines that the proposed use does not comply with the standards set forth in ORS 543.017 or rules adopted by th…
Within 20 days after the Water Resources Director issues a final order under ORS 537.170 after the conclusion of a contested case hearing, any party may file exceptions to the order with the Water Resources Commission.
The commission shall issue a modified order, if allowed, or deny the exceptions within 60 days after the close of the exception period under…
Except as provided in subsection (2) of this section, the Water Resources Department shall issue a final order or schedule a contested case hearing on an application for a water right referred to in ORS 537.140 or 537.400 within 180 days after the department proceeds with the application under ORS 537.150 (5).
At the request of the applicant, the department…
The Water Resources Department may approve an application for less water than applied for, or upon terms, limitations and conditions necessary for the protection of the public interest, including terms, limitations and conditions relating to the release of water from an impoundment or diversion structure necessary to prevent rapid fluctuation in the stream l…
The approval of an application referred to in ORS 537.140 or 537.400 shall be set forth in a water right permit issued by the Water Resources Department. The permit shall specify the details of the authorized use and shall set forth any terms, limitations and conditions as the department considers appropriate including but not limited to any applicable condi…
Any application, permit or license to appropriate water may be assigned, subject to the conditions of the application or permit, but no such assignment shall be binding, except upon the parties to the assignment, unless filed for record in the Water Resources Department.
An assignment of an application, permit or license to appropriate water filed for recor…
Notwithstanding ORS 537.220 and 537.635, except as provided in subsection (7) of this section, a record landowner holding a water right permit for an irrigation, nursery, temperature control, stock watering or agricultural water use that has a subsequent completion date may apply for assignment of all or part of the water right permit and for the issuance of…
In addition to any other authority the Water Resources Department may have, if a protest is properly filed, the department may work with the applicant for the water right assignment and the person filing the protest to determine whether the issues raised by the protest can be resolved informally.
Notwithstanding ORS 183.310, 536.076 and 536.077, the parties…
As used in this section, “undeveloped portion” means the difference between the maximum rate or duty specified in a water right permit and the maximum rate or duty diverted as of the later of:
June 29, 2005;
The time specified in the permit to perfect the water right; or
The time specified in the last-approved extension of time to perfect the water right.…
In any case where a permit from the Federal Energy Regulatory Commission is or shall be required in connection with the development of the applicant’s proposed project, the applicant shall make application for the necessary federal permit or license within six months, or, if the applicant is a municipal corporation, within 10 years, from the date of filing a…
When the Water Resources Department issues a reservoir permit for a new storage project to a county, municipality or district, the department shall include in the permit a date, not more than 10 years after the date the permit is issued, to begin and complete construction of diversion or storage works and to perfect the water right. An application for a rese…
In lieu of the procedure established pursuant to ORS 537.358, for any reservation pending on July 5, 1995, the state agency that requested the reservation may elect to have the proposed reservation considered:
As an application for a permit under ORS 537.140 to 537.211 and 537.248; or
As a rulemaking proceeding under the applicable provisions of ORS chapte…
After the Water Resources Department has received a request for issuance of a water right certificate accompanied by the survey required under ORS 537.230 that shows, to the satisfaction of the department, that an appropriation has been perfected in accordance with the provisions of the Water Rights Act, except as provided in subsection (4) of this section, …
When issuing a water right certificate under ORS 537.250 to a district, or to a government agency for a district, the Water Resources Department may issue the water right certificate for land not described in the permit if:
Water furnished by the district under the permit has been applied beneficially to the land;
The land not described in the permit that …
Except as provided under subsection (4) of this section for a permit issued to a municipality, whenever the time within which any appropriation under a permit should have been perfected has expired and the owner of the permit fails or refuses within three months thereafter to submit to the Water Resources Department proof of completion of the appropriation a…
A water right certificate issued in accordance with the provisions of ORS 537.250 which, after the expiration of three months from the date it is issued, has not been contested and canceled in the manner provided in ORS 537.260, and a water right certificate, when issued under ORS 539.140, shall be conclusive evidence of the priority and extent of the approp…
As used in ORS 537.282 to 537.299, “municipal applicant” means any municipal corporation or district as defined in ORS 543.655 that has applied for a permit to appropriate water for the purpose of generating hydroelectric power under the provisions of this chapter, or that has been accorded any right or preference under ORS 543.260, 543.270 or 543.610.
Notwithstanding any other provision of ORS 537.140 to 537.350, in accordance with the applicable provisions of ORS chapter 183, the Water Resources Commission shall by rule establish a procedure for processing applications to appropriate water for hydroelectric power under ORS 537.140 to 537.320.
Rules adopted under subsection (1) of this section:
To the e…
A municipal applicant may contract with a private person for the purpose of generating hydroelectric power. The municipal applicant shall retain sufficient benefit and interest in, and control of a joint project as necessary for the project to be considered a municipal project. A municipal applicant and a private person developing a joint project under this …
The Water Resources Commission shall establish rules necessary to carry out the provisions of ORS 537.285. The rules shall include the amount of control over and interest in a joint project a municipal applicant must retain in order to receive the benefit of the municipal preference and proceed under the municipal application process set forth in this chapte…
Whenever the Water Resources Department issues a permit under ORS 537.211 allowing a municipal corporation or district, as defined in ORS 543.655, to appropriate water for the purpose of generating hydroelectric power, the department shall impose the following conditions on the permit, in addition to any other term, limitation or condition imposed under ORS …
Whenever the Water Resources Commission issues a certificate under ORS 537.250 granting a municipal corporation or district as defined in ORS 543.655 the right to appropriate water for the purpose of generating hydroelectric power, the commission shall impose the following conditions on the certificate, in addition to any other term, limitation or condition …
If the holder of a permit to appropriate water for hydroelectric purposes under this chapter fails, after receiving notice under ORS 537.289 (2), to amend the joint agreement so the holder continues to qualify as a municipal applicant, or if the holder of the permit has assigned ownership of the permit to an entity other than a municipal corporation or distr…
If the owner of a certificate to appropriate water for hydroelectric purposes under this chapter fails, after receiving notice under ORS 537.289 (2), to amend the joint agreement so the owner continues to qualify as a municipal applicant, or if the holder of the certificate has assigned ownership of the certificate to an entity other than a municipal corpora…
If the Water Resources Commission cancels a permit or certificate under ORS 537.295 or 537.297, the municipal applicant may apply for a permit to appropriate water for hydroelectric purposes under this chapter, or the private developer may apply for a hydroelectric license under ORS chapter 543. However, the parties may not jointly apply for a permit to appr…
Any corporation organized for the construction, maintenance or operation of any railway may acquire, hold and appropriate to its use for railway purposes any waters within the state. The appropriation may be accomplished by the procedure provided by ORS 537.130 and 537.140 to 537.252. A railway corporation may acquire by purchase, gift or devise, or by conde…
Any person may enter upon any land for the purpose of locating a point of diversion of the water intended to be appropriated, and upon any land lying between such point and the lower terminus of the proposed ditch, canal or flume of the person, for the purpose of examining the same and of locating and surveying the line of such ditch, canal or flume, togethe…
In any transaction for the conveyance of real estate that includes a water right, the seller of the real estate shall, upon accepting an offer to purchase that real estate, also inform the purchaser in writing whether any permit, transfer approval order or certificate evidencing the water right is available and that the seller will deliver any permit, transf…
As used in ORS 537.332 to 537.360:
“In-stream” means within the natural stream channel or lake bed or place where water naturally flows or occurs.
“In-stream flow” means the minimum quantity of water necessary to support the public use requested by an agency.
“In-stream water right” means a water right held in trust by the Water Resources Department for t…
The people of the State of Oregon find and declare that:
Public uses are beneficial uses.
The recognition of an in-stream water right under ORS 537.336 to 537.348 shall not diminish the public’s rights in the ownership and control of the waters of this state or the public trust therein. The establishment of an in-stream water right under the provisions of …
The State Department of Fish and Wildlife may request the Water Resources Commission to issue water right certificates for in-stream water rights on the waters of this state in which there are public uses relating to the conservation, maintenance and enhancement of aquatic and fish life, wildlife and fish and wildlife habitat. The request shall be for the qu…
The Water Resources Commission by rule shall establish standards, criteria and procedures by which a state agency included under ORS 537.336 may request an in-stream water right to be issued under ORS 537.336.
Subject to the provisions of ORS 537.343, the Water Resources Commission shall issue a certificate for an in-stream water right. The in-stream water right shall date from the filing of the application with the commission. The certificate shall be in the name of the Water Resources Department as trustee for the people of the State of Oregon and shall be issue…
A proposed final order issued under ORS 537.170 (3) or (5) for an in-stream water right certificate may include any condition the Water Resources Director considers necessary, but which is consistent with the intent of ORS 537.332 to 537.360. The proposed final order may:
Approve the in-stream water right for the quantity of water requested;
Approve the re…
All minimum perennial streamflows established on any waters of this state before June 25, 1988, shall be converted to in-stream water rights after the Water Resources Commission reviews the streamflows and the Water Resources Department issues a certificate for an in-stream water right in accordance with ORS 537.343 with the same priority date as the minimum…
Any person may purchase or lease all or a portion of an existing water right or accept a gift of all or a portion of an existing water right for conversion to an in-stream water right. Any water right converted to an in-stream water right under this section shall retain the priority date of the water right purchased, leased or received as a gift. At the requ…
Except as provided in ORS 537.343, the Water Resources Department shall process a request received under ORS 537.336 for a certificate for an in-stream water right in accordance with the provisions for obtaining a permit to appropriate water under ORS 537.140 to 537.252.
After the Water Resources Commission issues a certificate for an in-stream water right under ORS 537.341 to 537.348, the in-stream water right shall have the same legal status as any other water right for which a certificate has been issued.
An in-stream water right is not subject to cancellation under ORS 537.260 or 537.410 to 537.450 but an in-stream wate…
Notwithstanding any provision of ORS 537.332 to 537.343 and 537.350, the right to the use of the waters of this state for a project for multipurpose storage or municipal uses or by a municipal applicant, as defined in ORS 537.282, for a hydroelectric project, shall take precedence over an in-stream water right when the Water Resources Department conducts a r…
An in-stream water right established under the provisions of ORS 537.332 to 537.360 shall be subject to the provisions of ORS 536.700 to 536.780.
Any local government, local watershed council or state agency or any other individual cooperating jointly with a local government, local watershed council or state agency may request the Water Resources Commission to reserve unappropriated water for multipurpose storage for future economic development.
A request under subsection (1) of this section shall be…
In adopting a rule under ORS 537.356 to reserve unappropriated water for multipurpose storage for future economic development, the Water Resources Commission shall include a public interest review that takes into consideration the factors described under ORS 537.170.
A person requesting use of the reserved water for new storage shall submit a water right ap…
If an application is pending under this chapter for a water right permit to use water for hydroelectric purposes or under ORS 543.010 to 543.610 for a hydroelectric permit or license at the time the Water Resources Commission receives an application for an in-stream water right under ORS 537.336 for the same stream or reach of the stream, the commission shal…
Notwithstanding any condition or limitation of a water right permit issued under ORS 537.211 or 537.625 or a water right certificate issued under ORS 537.250, 537.630 or 539.140, upon receipt of a request by the State Department of Agriculture, the Water Resources Commission may, by rule, extend the irrigation season of a subbasin beyond the period establish…
At a location described in subsection (2) of this section, a person may not:
Use, store or divert any waters under ORS 537.130;
Use or attempt to use any ground water under ORS 537.535;
Construct or attempt to construct any well or other means of developing and securing ground water under ORS 537.535;
Collect or use precipitation water from an artificial…
In any valuation for rate-making purposes, or in any proceeding for the acquisition of rights to the use of water and the property used in connection therewith, under any license or statute of the United States or under the laws of Oregon, no value shall be recognized or allowed for such rights in excess of the actual cost to the owner of perfecting them in …
Any certificate issued for power purposes to a person other than the United States, or the State of Oregon or any municipality thereof, shall provide that after the expiration of 50 years from the granting of the certificate or at the expiration of any federal power license, and after not less than two years’ notice in writing to the holder of the certificat…
All applications for reservoir permits shall be subject to the provisions of ORS 537.130, 537.140, 537.142 and 537.145 to 537.240, except that an enumeration of any lands proposed to be irrigated under the Water Rights Act shall not be required in the primary permit. But the party proposing to apply to a beneficial use the water stored in any such reservoir …
Reservoirs in existence on or before January 1, 1995, that store less than 9.2 acre-feet of water or with a dam or impoundment structure less than 10 feet in height, are found to be a beneficial use of the water resources of this state. Except as provided in subsection (4) of this section, such reservoirs are exempt from regulation by the Water Resources Com…
The Water Resources Department shall issue a water right certificate to any person who submitted an application for a reservoir under section 4, chapter 595, Oregon Laws 1993.
Within 90 days after issuing a certificate under subsection (1) of this section, the department shall provide notice of the certificate in the manner the department determines to be t…
In lieu of the process set forth in ORS 537.140 to 537.211 for applying for a water right permit, an applicant for a reservoir permit may submit an application to the Water Resources Department to issue a water right permit under ORS 537.211 or a certificate under ORS 537.250 according to the process set forth in this section if the reservoir:
Has a storage…
Whenever the owner of a permit to appropriate the public waters of Oregon fails to commence actual construction work within the time required by law, or having commenced construction work as required by law, fails or neglects to prosecute the construction work with reasonable diligence, or fails to complete the construction work within the time required by l…
Whenever a permit holder fails to comply with the laws of the state and the requirements of the permit as to the commencement of work with due diligence, completion of the work of construction or the application of the water for a beneficial use, and the permit is subject to cancellation as provided in ORS 537.410 to 537.450, the Water Resources Commission s…
If the decision of the Water Resources Commission requires the cancellation of a permit, then the commission shall at once cancel, or have canceled, the permit. Thereafter the permit shall be of no further force or effect, and shall not be recognized or admitted as evidence of any right or interest in or to the waters covered by it in any proceeding in the c…
The provisions of ORS 536.076 and 536.077, and rules adopted thereunder, apply to a contested case proceeding on a proposed final order issued under ORS 537.410 to 537.450.
If a petition for review of an order canceling a permit or appropriation is filed under ORS 536.075, the Water Resources Commission may not cancel the permit or appropriation under ORS 5…
The Water Resources Commission may by rule provide that the owners of permits shall submit or furnish proofs of commencement of work, prosecution of work with due diligence, completion of work, and of the application of water to a beneficial use under the permits. Failure to comply with the commission’s rules in respect to the proofs shall be considered prim…
As used in ORS 537.455 to 537.500 and 540.510:
“Conservation” means the reduction of the amount of water diverted to satisfy an existing beneficial use achieved either by improving the technology or method for diverting, transporting, applying or recovering the water or by implementing other approved conservation measures.
“Conserved water” means that amou…
The Legislative Assembly finds and declares that conservation and efficient utilization of water benefits all water users, provides water to satisfy current and future needs through reduction of consumptive waste, improves water quality by reducing contaminated return flow, prevents erosion and allows increased in-stream flow.
It is therefore declared to be…
The provisions of ORS 537.455 to 537.500 establish a voluntary program and apply only to those persons who choose to apply for an allocation of conserved water under ORS 537.465.
Note: See note under 537.455.
Any person or group of persons holding a water use subject to transfer as defined in ORS 540.505 may submit an application to the Water Resources Commission for approval of an allocation of conserved water for a measure that:
The person or group of persons intends to implement; or
Was implemented by the person or group of persons within five years prior to…
Upon receipt of an application for allocation of conserved water under ORS 537.465, the Water Resources Commission shall give notice of receipt of the application in accordance with ORS 540.520 (6)(c)(B).
The commission shall allocate conserved water as provided in subsection (3) of this section and approve modifications of water rights as provided in subse…
The Water Resources Commission shall adopt rules and standards necessary to carry out the provisions of ORS 537.455 to 537.500. The rules may include formulas or other criteria for evaluating the effects of allocation of water on existing rights and for determining whether, and to what extent, mitigation shall be required.
Note: See note under 537.455.
Notwithstanding any other provision of ORS chapter 536, 537, 538, 539, 540, 541, 542 or 543, the priority of any right to the use of conserved water, including an in-stream water right, under an application submitted and approved by the Water Resources Commission under ORS 537.465 and 537.470 shall be either the same as or one minute after the priority of th…
Any person or agency allocated conserved water under ORS 537.470 may reserve the water in stream for future out-of-stream use or otherwise use or dispose of the conserved water. Any person or agency to whom conserved water is allocated shall notify the commission of the dispensation of the right to the use of conserved water. The notice shall include:
The n…
Any agency or political subdivision of this state may purchase a right to the use of conserved water, as defined under ORS 537.455, or accept a gift of a right to the use of conserved water as defined under ORS 537.455. If an agency or political subdivision requests that the conserved water remain in the stream, the commission shall manage the water in a man…
A water right for conserved water under ORS 537.455 to 537.500 and 540.510 shall have the same legal status as any other water right for which a certificate has been issued.
A water right for conserved water that is reserved in stream for future out-of-stream use under ORS 537.490 or that the commission manages under ORS 537.495 is not subject to cancellati…
ORS 537.505 to 537.795 and 537.992 shall be known as the “Ground Water Act of 1955.”
As used in ORS 537.505 to 537.795 and 537.992, unless the context requires otherwise:
“Altering” a well means the deepening, recasing, perforating, reperforating, the installation of packers or seals and other material changes in the design of the well.
“Constructing” a well includes boring, digging, drilling or excavating and installing casing or well scr…
The Legislative Assembly recognizes, declares and finds that the right to reasonable control of all water within this state from all sources of water supply belongs to the public, and that in order to ensure the preservation of the public welfare, safety and health it is necessary that:
Provision be made for the final determination of relative rights to app…
(Aquifer Storage and Recovery)
The Legislative Assembly declares that aquifer storage and recovery is a beneficial use inherent in all water rights for other beneficial uses. Aquifer storage and recovery is the storage of water from a separate source that meets drinking water standards in a suitable aquifer for later recovery and not having as one of its primary purposes the restoration o…
Notwithstanding any other provision of law, the injection into aquifers of water that complies with drinking water standards established by the Oregon Health Authority under ORS 448.273 under an aquifer storage and recovery limited license or permit:
Shall not be considered a waste, contaminant or pollutant;
Shall be exempt from the requirement to obtain a…
In accordance with this section, the Water Resources Commission shall establish rules for the permitting and administration of aquifer storage and recovery projects. The rules shall establish the Water Resources Department as the sole permitting agency for the projects, but the Department of Environmental Quality and the Oregon Health Authority may comment o…
No person or public agency shall use or attempt to use any ground water, construct or attempt to construct any well or other means of developing and securing ground water or operate or permit the operation of any well owned or controlled by such person or public agency except upon compliance with ORS 537.505 to 537.795 and 537.992 and any applicable order or…
Subject to subsection (3) of this section, a registration, certificate of registration, application for a permit, permit, certificate of completion or ground water right certificate under ORS 537.505 to 537.795 and 537.992 is not required for the use of ground water for:
Stockwatering purposes, unless the use exceeds 12,000 gallons per day and occurs at a n…
Any permit granted or application for a permit approved under ORS 537.510, 537.520, 537.530, 537.540, 537.550, 537.560, 537.570, 537.580, 537.590 and 537.600 prior to and still valid and in effect on August 3, 1955, is considered to be a permit issued under ORS 537.625. Any application for a permit under ORS 537.510, 537.520, 537.530, 537.540, 537.550, 537.5…
Except as otherwise provided in ORS 537.545 or 537.575 or 537.595 and subject to determination under ORS 537.670 to 537.695, actual and lawful application of ground water to beneficial use prior to August 3, 1955, by or under the authority of any person or public agency or by or under the authority of a predecessor in interest of such person or public agency…
Except as otherwise provided in ORS 537.545 or 537.575 or 537.585 and subject to determination under ORS 537.670 to 537.695, when any person or public agency on August 3, 1955, is lawfully engaged in good faith in such construction, alteration or extension of a well for the application of ground water to beneficial use, the right to appropriate such ground w…
Any person or public agency claiming any right to appropriate ground water under ORS 537.585 or 537.595, except for any purpose exempt under ORS 537.545, is entitled to receive from the Water Resources Commission within three years after August 3, 1955, a certificate of registration as evidence of a right to appropriate ground water as provided in ORS 537.58…
The Water Resources Commission shall accept all registration statements referred to in ORS 537.605 completed and returned to the commission in proper form, endorse on the registration statement the date of the return and record each statement. Upon recording the statement, the commission shall issue to the registrant a certificate as evidence that the regist…
Any person or public agency intending to acquire a wholly new right to appropriate ground water or to enlarge upon any existing right to appropriate ground water, except for any purpose exempt under ORS 537.545, shall apply to the Water Resources Department for and be issued a permit before withdrawing or using the ground water.
The application for a permit…
Notwithstanding any contrary provision of law, and subject to subsection (2) of this section, the Water Resources Department may approve an application under ORS 537.615 by a public water system to appropriate ground water in a ground water quality management area declared under ORS 468B.180 for expanded group domestic use in an amount of water equivalent to…
The Water Resources Department shall accept all applications for permits submitted under ORS 537.615 in proper form.
Within 15 days after receiving the application, the department shall determine whether the application contains the information listed under ORS 537.615 (2) and is complete and not defective, including the payment of all applicable fees or fe…
Within 60 days after the Water Resources Department proceeds with the application under ORS 537.620 (5)(c), the department shall complete application review and issue a proposed final order approving or denying the application or approving the application with modifications or conditions. The department may request the applicant to provide additional informa…
A contested case proceeding under ORS 537.621 (8) shall be conducted in accordance with the applicable provisions of ORS chapter 183 and ORS 536.076 and 536.077, except that an interlocutory appeal under ORS 183.480 (3) is not allowed.
Notwithstanding ORS chapter 537, 540 or 541, a proposed final order issued by the Water Resources Department under ORS chapter 537, 540 or 541 for an application requesting that the department approve a new water right or a change to an existing water right or permit, registration or license, shall become, without further department action, a final order as …
If, after the contested case hearing or, if a hearing is not held, after the close of the period allowed to file a protest, the Water Resources Director determines that the proposed use that is the subject of an application filed under ORS 537.615 does not ensure the preservation of the public welfare, safety and health as described in ORS 537.525, the direc…
Within 20 days after the Water Resources Director issues a final order under ORS 537.625 after the conclusion of a contested case hearing, any party may file with the Water Resources Commission exceptions to the order.
The commission shall issue a modified order, if allowed, or deny the exceptions within 60 days after close of the exception period under sub…
Except as provided in subsection (2) of this section, the Water Resources Department shall issue a final order or schedule a contested case hearing on an application for a water right referred to in ORS 537.615 within 180 days after the department proceeds with the application under ORS 537.620 (5).
At the request of the applicant, the department may extend…
The Water Resources Department may approve an application for less ground water than applied for or upon terms, conditions and limitations necessary for the protection of the public welfare, safety and health.
In any event the department may not approve the application for more ground water than is applied for or than can be applied to a beneficial use.
Th…
When an application discloses the probability of wasteful use or undue interference with existing wells or that any proposed use or well will impair or substantially interfere with existing rights to appropriate surface water by others, or that any proposed use or well will impair or substantially interfere with existing rights to appropriate ground water fo…
As used in this section, “undeveloped portion” means the difference between the maximum rate or duty specified in a water right permit and the maximum rate or duty appropriated as of the later of:
June 29, 2005;
The time specified in the permit to perfect the water right; or
The time specified in the last-approved extension of time to perfect the water ri…
Any certificate of registration issued under ORS 537.610 or permit issued under ORS 537.625 may be assigned, subject to the conditions of the certificate of registration or permit, but no such assignment shall be binding, except upon the parties to the assignment, unless filed for record in the Water Resources Department.
An assignment of an application fil…
Upon its own motion, or upon the request of another state agency or local government, the Water Resources Commission, within the limitations of available resources, shall proceed as rapidly as possible to identify and define tentatively the location, extent, depth and other characteristics of each ground water reservoir in this state, and shall assign to eac…
The Water Resources Director upon the motion of the director or, in the discretion of the director, upon receipt of a petition therefor by any one or more appropriators of ground water from such ground water reservoir, may proceed to make a final determination of the rights to appropriate the ground water of any ground water reservoir in this state.
The dir…
Whenever the Water Resources Director has reason to believe that two or more ground water reservoirs overlie one another wholly or in part, the director may proceed to a final determination of the rights to appropriate the ground water of each of such ground water reservoirs in the same proceeding under ORS 537.670 to 537.695.
The director may include in a …
Testimony shall be taken, evidence shall be open to inspection and claims shall be subject to contest in a proceeding to determine rights to appropriate the ground water of any ground water reservoir initiated under ORS 537.670 as nearly as possible in the same manner as provided in ORS 539.070, 539.090, 539.100 and 539.110 for the determination of the relat…
As soon as practicable after compilation of the evidence obtained in proceedings under ORS 537.665 to 537.680, the Water Resources Director shall make and cause to be entered of record in the Water Resources Department findings of fact and an order of determination, determining and establishing the several rights to appropriate the ground water of the ground…
The evidence relied upon by the Water Resources Director in the entry of the findings of fact and order of determination under ORS 537.685, together with a copy of such findings and order, shall be certified to by the director and filed with the clerk of the circuit court wherein the determination is to be heard, which shall be the circuit court of any count…
The determination of the Water Resources Director under ORS 537.685, as confirmed or modified by the circuit court or Supreme Court, shall be a conclusive adjudication as to all claimants of rights to appropriate the ground water of each ground water reservoir included within the order of determination.
Upon the final determination under ORS 537.670 to 537.695 of the rights to appropriate the ground water of any ground water reservoir, the Water Resources Director shall issue to each person or public agency represented in the determination proceedings and who is determined to have such a right a ground water right certificate, setting forth the name and pos…
All ground water used in this state for any purpose shall remain appurtenant to the premises upon which it is used and no change in use or place of use of any ground water for any purpose may be made without compliance with a procedure as nearly as possible like that set forth in ORS 540.520 and 540.530. However, the owner of any ground water right may, upon…
Whenever, after notice to and opportunity to be heard by such holder, the Water Resources Commission finds that the holder of any permit or certificate of registration issued under ORS 537.505 to 537.795 and 537.992 is willfully violating any provision of the permit or certificate of registration or any provision of ORS 537.505 to 537.795 and 537.992, the co…
The Water Resources Commission by rule may designate an area of the state a critical ground water area if:
Ground water levels in the area in question are declining or have declined excessively;
The Water Resources Department finds a pattern of substantial interference between wells within the area in question;
The department finds a pattern of interferen…
A rule adopted by the Water Resources Commission under ORS 537.730 shall:
Define the boundaries of the critical ground water area and shall indicate which of the ground water reservoirs located either in whole or in part within the area in question are included within the critical ground water area. Any number of ground water reservoirs which either wholly …
In addition to any applicable requirements under ORS chapter 183, the Water Resources Commission shall file a copy of any rules designating a critical ground water area under ORS 537.730 to 537.740 with the county clerk of each county within which any part of the critical ground water area lies, and the county clerk shall record the designation in the deed r…
Any time after the Water Resources Commission adopts a rule under ORS 537.730 designating a critical ground water area, the commission may initiate a contested case proceeding to limit the use of ground water in the area if the commission has reason to believe that any of the qualifying criteria of ORS 537.730 (1) exists.
Upon the conclusion of a contested …
The Water Resources Department shall establish a program for the purpose of replacing, repairing or deepening domestic personal use wells that are affected by declining ground water levels resulting from overallocation of ground water within the Greater Harney Valley Groundwater Area of Concern.
In administering the program, the department:
May enter into …
There is established in the State Treasury, separate and distinct from the General Fund, the Domestic Well Remediation Fund. Interest earned by the Domestic Well Remediation Fund shall be credited to the fund. All moneys in the Domestic Well Remediation Fund are continuously appropriated to the Water Resources Department to carry out the purposes described i…
In the administration of ORS 537.505 to 537.795 and 537.992, the Water Resources Commission may encourage, promote and recognize voluntary agreements among ground water users from the same ground water reservoir. When the commission finds that any such agreement, executed in writing and filed with the commission, is consistent with the intent, purposes and r…
The Water Resources Commission may by rule establish a system of credits that may be used to offset the potential interference with hydraulically connected surface waters caused by ground water withdrawals within the Deschutes River Basin to account for projects performed in the basin that make water available for mitigation.
A person proposing a project th…
No person shall advertise services to construct, alter, abandon or convert wells, offer to enter or enter into a contract with another person or public agency to construct, alter, abandon or convert a well for such other person, cause any well construction, alteration, abandonment or conversion to be performed under such a contract or operate well drilling m…
The written examination required under ORS 537.747 (3)(b) shall be prepared to test the applicant’s knowledge and understanding of the following subjects:
Laws of the state pertaining to the appropriation and use of ground water, the licensing requirements of ORS 537.747 to 537.765, the construction of wells and the preparation and filing of well logs.
Rul…
Any person who contracts or offers services to contract to construct, alter, abandon or convert wells shall have in effect a surety bond or an irrevocable letter of credit issued by an insured institution, as defined in ORS 706.008, running to the State of Oregon in the sum of $20,000, ensuring that in the construction, alteration, abandonment or conversion …
As used in this section:
“Licensed or permitted person” means a person licensed under ORS 537.747 or permitted under ORS 537.753 (4).
“Start card” means a form containing all information required by the Water Resources Department as a notification that a licensed or permitted person will commence work on a well.
Each licensed or permitted person who has e…
There is established in the State Treasury the Water Resources Department Operating Fund to provide for the payment of the administrative expenses of the Water Resources Commission in carrying out the provisions of ORS 537.762.
The Water Resources Department Operating Fund shall consist of:
Fees received pursuant to ORS 537.762.
All moneys received on beh…
As used in this section, “licensed or permitted person” means a person licensed under ORS 537.747 or permitted under ORS 537.753 (4).
The business or activity of constructing new wells or altering, abandoning or converting existing wells is declared to be a business or activity affecting the public welfare, health and safety. In order to enable the state to…
The Water Well Abandonment, Repair and Replacement Fund is established in the State Treasury, separate and distinct from the General Fund. Interest earned by the Water Well Abandonment, Repair and Replacement Fund shall be credited to the fund. Moneys in the fund are continuously appropriated to the Water Resources Department for the purpose of carrying out …
As used in this section, “repair” may include, but is not limited to, a well deepening.
Moneys in the Water Well Abandonment, Repair and Replacement Fund may be disbursed under authority of the Water Resources Director for the purposes described in this section. The Water Resources Department may disburse moneys from the fund to provide financial assistance…
The Legislative Assembly finds that ground water protection is a matter of statewide concern. No ordinance, order or regulation shall be adopted by a local government to regulate the inspection of wells, construction of wells or water well constructors subject to regulation by the Water Resources Commission or the Water Resources Department under ORS 537.747…
(Regulation of Ground Water Wells)
The owner or operator of any well, except wells used for purposes listed in ORS 537.545, shall conduct a pump test at least once every 10 years and report the results of that test to the Water Resources Commission. The owner or operator may conduct the test in conjunction with normal pump service and testing or at any time more convenient to the owner or ope…
Whenever the Water Resources Commission finds that any well, including any well exempt under ORS 537.545, is by the nature of its construction, operation or otherwise causing wasteful use of ground water, is unduly interfering with other wells or surface water supply, is a threat to health, is polluting ground water or surface water supplies, is causing subs…
The Water Resources Commission shall regulate or cause to be regulated the controlling works of wells and distribute ground water to secure compliance or equal and fair distribution if the commission finds that:
Any person or public agency is using or attempting to use any ground water or is operating or permitting the operation of any well owned or control…
In the administration of ORS 537.505 to 537.795 and 537.992, the Water Resources Commission may:
Require that all flowing wells be capped or equipped with valves so that the flow of ground water may be completely stopped when the ground water is not actually being applied to a beneficial use.
Enforce:
General standards for the construction, alteration, ab…
If the Water Resources Department has information that a person has engaged, or is about to engage, in any activity that is or will be a violation of ORS 537.747, 537.753, 537.762 or 537.765 or the standards described in ORS 537.780 (1)(b) or (c), in addition to any other available remedies, the department may apply to the circuit court for Marion County, or…
The Water Resources Commission shall adopt rules which govern the disposal by reinjection or other means of geothermal fluids derived from:
Geothermal or hot water wells less than 2,000 feet deep producing fluids of less than 250 degrees Fahrenheit bottom hole temperature; or
Geothermal or hot water wells less than 2,000 feet deep producing fluids that hav…
In the administration of ORS 537.505 to 537.795 and 537.992, the Water Resources Commission shall collect in advance, the fees set forth in ORS 539.081 for any service similar to any of those referred to in ORS 539.081.
All fees collected by the commission under subsection (1) of this section shall be paid into the General Fund of the State Treasury.
The Water Resources Commission, upon the commission’s own initiative, or upon complaint alleging violation of any provision of ORS 537.505 to 537.795 and 537.992, or any rule adopted pursuant thereto, may investigate to determine whether a violation has occurred. If the investigation indicates that a violation has occurred, the commission shall notify the pe…
As used in this section, “licensed or permitted person” means a person licensed under ORS 537.747 or permitted under ORS 537.753 (4).
A licensed or permitted person who files a well log under ORS 537.765 shall include on the well log the identification number provided by the Water Resources Department. The licensed or permitted person shall affix the identi…
A landowner may apply to the Water Resources Department for a number to identify a well on the landowner’s property.
If the department has not previously assigned an identification number to the well, no later than 10 days after receiving an application under this section, the department shall assign an identification number to the well.
Failure of a seller to comply with the provisions of ORS 537.789 or 537.791 does not invalidate an instrument of conveyance of real estate.
ORS 537.505 to 537.795 and 537.992 are intended to be supplementary and in addition to and are not intended to repeal any law relating to the surface waters of this state.
The Water Resources Commission shall adopt by rule an initial temperature below which low temperature geothermal appropriations shall not be protected from thermal interference caused by ground water appropriations for other purposes.
Note: 537.796 was enacted into law by the Legislative Assembly but was not added to or made a part of ORS chapter 537 or any…
As used in this section:
“District” means:
An irrigation district formed under ORS chapter 545;
A drainage district formed under ORS chapter 547;
A water improvement district formed under ORS chapter 552; or
A water control district formed under ORS chapter 553.
“Registered geologist” has the meaning given that term in ORS 672.505.
“Registered profess…
The State Board of Examiners for Engineering and Land Surveying may issue a water right examiner certificate to an applicant described in ORS 537.797. The board shall require an applicant for the certificate to pass an examination establishing the qualification of the applicant to be a water right examiner. The Water Resources Department shall prepare, admin…
Any person who has applied for or received a permit or a transfer to appropriate water under ORS 537.211, 537.625 or 540.530 on or before July 9, 1987, shall notify the Water Resources Department that the work has been completed and either:
Hire a water right examiner certified under ORS 537.798 to conduct a survey, the original to be submitted as required …
All ditches now or hereafter constructed, for the purpose of utilizing waste, spring or seepage waters, shall be governed by the same laws relating to priority of right as those ditches constructed for the purpose of utilizing the waters of running streams. However, the person upon whose lands the seepage or spring waters first arise shall have the right to …
As used in ORS chapters 537 and 540:
“Basin” means one of the river basins within this state, as defined by Water Resources Department Map No. 0.2, dated 1987, and entitled “Oregon Drainage Basins,” unless the context requires otherwise.
“Basin of origin” means the basin in which surface or ground water that is the subject of an application under ORS 537.2…
When an application for appropriation of water submitted under ORS 537.211, 537.400, 537.620, 543.210, 543.290 or for a change in the place of use of an existing water right submitted under ORS 540.520 proposes use of water outside the basin of origin, the application shall include, in addition to any other information required, an analysis of the following:…
Notwithstanding any other provision of ORS 537.801 to 537.809, an application governed by ORS 537.803 shall be processed as follows:
Upon determination that the application is acceptable, the Water Resources Commission shall conduct a comprehensive review of the application, at the applicant’s expense.
When the comprehensive review is complete, the commiss…
Before approving or recommending approval of an application subject to ORS 537.803, the Water Resources Commission shall reserve an amount of water adequate for future needs in the basin of origin, including an amount sufficient to protect public uses, and subordinate the out-of-basin use to that reservation.
No waters located or arising within a basin shall be diverted, impounded or in any manner appropriated for diversion or use beyond the boundaries of that basin except upon the express consent of the Legislative Assembly. In the event the Legislative Assembly shall give its consent to any such request it may attach thereto such terms, conditions, exceptions, …
ORS 537.801 to 537.860 shall also apply to the waters located within the boundaries of this state of any river, stream, lake or other body of water serving as part of the common boundary of this state and any other state and over which this state has concurrent jurisdiction, except that said sections shall not apply to the diversion, impoundment or appropria…
No person, or agency of any state or of the United States, shall attempt to condemn any waters within the boundaries of this state for use outside the basin of origin without first complying with the requirements of ORS 537.801 to 537.810 and this section.
Pursuant to the provisions of ORS 537.810, consent is hereby given to the City of Walla Walla, a municipal corporation of the State of Washington, to appropriate, impound and divert certain waters from Mill Creek, a tributary of the Walla Walla River, located in Township 6 North, Range 38, E.W.M., Umatilla County, Oregon, for the beneficial use of both the S…
Upon receiving legislative permission to appropriate waters under ORS 537.801 to 537.860, the permittee, upon filing in the Water Resources Department a certified copy of the Act, certified to by the Secretary of State, may proceed to obtain an appropriation of waters in the manner provided by the laws of this state for the appropriation of waters for benefi…
In the event of any violation or attempt to violate any of the provisions of ORS 537.801 to 537.860, the Governor shall cause to be instituted such suits and actions as may be necessary to protect and defend the sovereign rights and interests of the state in the premises. Persons are given right of redress against such violator at private suit or action unde…
Pursuant to the provisions of ORS 537.810, consent is hereby given to any domestic water supply district formed under ORS chapter 264 to permit the diversion of water for use on property a portion of which is within a state adjoining Oregon, subject to the following conditions:
The majority of the property is within Oregon.
The property is developed with e…
ORS 537.810 to 537.850 shall not affect any valid prior appropriation or water right existing on May 12, 1951.
Subject to the limitations imposed by ORS 537.801 to 537.860, any municipal corporation of any state adjoining Oregon may acquire title to any land or water right within Oregon, by purchase or condemnation, which lies within any watershed from which the municipal corporation obtains or desires to obtain its water supply.
PLACE-BASED WATER PLANNING
The Place-Based Water Planning Fund is established in the State Treasury, separate and distinct from the General Fund. Interest earned by the Place-Based Water Planning Fund shall be credited to the fund. The fund consists of moneys appropriated to the fund by the Legislative Assembly and federal, public or private moneys designated for deposit in the fund. …
As used in this section:
“Eligible implementation coordination costs”:
Means costs associated with actions taken to coordinate the implementation of a state-recognized place-based integrated water resources plan.
Does not include the costs of implementing a project.
“Environmental justice community” has the meaning given that term in ORS 182.535.
“India…
At least every eight years, the Water Resources Department shall report, in the manner provided by ORS 192.245, to a committee or interim committee of the Legislative Assembly related to water, and to the Water Resources Commission, on the funding programs described in ORS 537.766, 537.767, 537.872, 537.873, 541.561 to 541.581 and 541.651 to 541.696.
The re…
The activity of drilling geotechnical holes is declared to be an activity affecting the public welfare, health and safety. In order to enable this state to protect the welfare, health and safety of its citizens, any person that drills a geotechnical hole shall keep a log of each geotechnical hole that is drilled and submit a report to the Water Resources Com…
The person responsible for the drilling of a geotechnical hole for which a report is required under ORS 537.880 must have:
A current monitoring well constructor’s license as specified in rules adopted by the Water Resources Commission;
A current water supply well constructor’s license as specified in rules adopted by the commission;
A current certificate …
The Water Resources Commission may prescribe by rule the form, contents, filing deadline and other requirements for the report required under ORS 537.880.
Except as provided in paragraph (b) of this subsection, each report required to be submitted under ORS 537.880 must be accompanied by a recording fee of $25.
If more than one geotechnical hole is drilled…
The Water Resources Department Geotechnical Fund is established in the State Treasury, separate and distinct from the General Fund.
The Water Resources Department Geotechnical Fund shall consist of:
Recording fees paid under ORS 537.890; and
All moneys from gifts, grants or appropriations to the fund.
Moneys in the Water Resources Department Geotechnical…
A water supplier that sells water to the public at a distribution location authorized for hauled water by the water supplier shall:
Maintain records of the water sales that include:
The name and contact information of the person that purchased the water.
The date of the sale.
The quantity of the water.
The license plate number of the vehicle used to hau…
A person that purchases water from a water supplier at a distribution location to be hauled for irrigation or nursery purposes shall:
Keep records of:
The date and location of the purchase.
The date on which the water is delivered.
If hauling water for another person, the name and contact information of the person to whom the water will be delivered and …
A person may not haul water to, or arrange for the hauling of water to, a grow site for plants in the plant Cannabis family Cannabaceae if:
The grow site is not registered or licensed under ORS 475C.065, 475C.792 or 571.281; and
The crop of plants is in an amount that is not allowed under state law.
A person may not willfully or negligently provide false …
Violation of ORS 537.130 (2) is a Class B misdemeanor.
Any person who willfully diverts or uses water to the detriment of others without compliance with law shall be punished as provided in subsection (1) of this section. The possession or use of water, except when a right of use is acquired in accordance with law, shall be prima facie evidence of the guilt…
In addition to any other remedy provided by law, the Water Resources Commission may impose a civil penalty against any person who, in the construction of a well, violates any provision of ORS 537.747 to 537.795 and 537.992, or any rule promulgated pursuant thereto. A civil penalty shall be in an amount determined by the commission in accordance with the rule…