Chapter 454 — Sewage Treatment and Disposal Systems
ORS 454.685 Order limiting or prohibiting construction of sewage disposal systems; factors to be considered
Whenever the Environmental Quality Commission finds that the construction of subsurface sewage disposal systems, alternative sewage disposal systems or nonwater-carried sewage disposal facilities should be limited or prohibited in an area, it shall issue an order limiting or prohibiting such construction. The order shall be issued only after public hearing for which more than 30 days’ notice is given. Notice must be in form reasonably calculated to notify interested persons in the affected area.
In issuing an order authorized by subsection (1) of this section, the commission shall consider the following factors for the proposed affected area:
Present and projected density of population.
Size of building lots.
Topography.
Porosity and absorbency of soil.
Any geological formations which may adversely affect the disposal of sewage effluent by subsurface means.
Ground and surface water conditions and variations therein from time to time.
Climatic conditions.
Present and projected availability of water from unpolluted sources.
Type of and proximity to existing domestic water supply sources.
Type of and proximity to existing surface waters.
Capacity of existing subsurface sewage disposal systems.
Official sources · 2Tap to view provenance and version history
Provenance
2023 Oregon Revised Statutes
Official online edition
- Source
- oregonlegislature.gov
- SHA-256
2aa9f568…4af45d03- Review
- auto verified
Version history
Prior statutory text is not available in the ingested published editions. Consult an earlier official ORS edition or the cited Oregon Laws chapter.
2025 Oregon Revised Statutes — official online source · active · operative text
Official source2023 Oregon Revised Statutes · active · operative text
Official source