Chapter 540 — Distribution and Storage of Water; Watermasters; Water Right Changes, Transfers an
ORS 540.443 Definitions for ORS 540.443 to 540.491
As used in ORS 540.443 to 540.491:
“Construct” means:
To build a new dam;
To modify dam height; or
To make modifications to a dam that:
Do not include modifying dam height, performing maintenance actions or removing a dam;
Have a potential impact on the safe functioning of the dam; and
Are to an extent that the modified dam structures no longer conform to the original design.
“Dam” means:
A hydraulic structure built above the natural ground gradeline that is used to impound water or wastewater; and
Appurtenant structures on or adjacent to hydraulic structures described in paragraph (a) of this subsection that affect the stability of, or the control of water through or away from, the hydraulic structure.
“Dam failure” means a rapid, sudden and uncontrolled release of water or wastewater due to loss of dam integrity.
“Emergency action plan” means a plan that assists a dam owner or operator, and local emergency management personnel, to perform actions to ensure human safety in the event of a potential or actual dam failure.
“High hazard rating” means that the department expects loss of human life to occur if a dam fails.
“Maintenance action” means measures that are necessary to address a condition that, if left unaddressed, may cause a dam to become unsafe or potentially unsafe.
“Potentially unsafe” means that, based on an inspection or analysis:
It is probable that a dam cannot withstand an extreme flood or earthquake; or
The dam has a high risk of internal erosion.
“Significant hazard rating” means the department does not expect loss of life to occur if a dam fails, but does expect extensive damage to property or public infrastructure.
“Unsafe” means that, based on an inspection or analysis:
It is probable that a dam cannot be depended upon to retain or pass water or wastewater as designed or operated; and
Inability of the dam to retain or pass water or wastewater as designed or operated could result in dam failure.
Official sources · 1Tap to view provenance details
Provenance
2025 Oregon Revised Statutes — official online source
Official online edition
- Source
- oregonlegislature.gov
- SHA-256
117d8691…18c1d403- Review
- auto verified
Version history
2025 Oregon Revised Statutes — official online source