Chapter 701 — Construction Contractors and Contracts
ORS 701.320 Offer of warranty; withdrawal of contract offer
A contractor that enters into a contract to construct a new residential structure or zero-lot-line dwelling, or to sell a new residential structure or zero-lot-line dwelling constructed by the contractor, shall make a written offer to the property owner or original purchaser of the structure or dwelling of a warranty against defects in materials and workmanship for the structure or dwelling. The property owner or original purchaser of the structure or dwelling may accept or refuse the offer of a warranty by the contractor. If a contractor makes the written offer of a warranty before the contractor and the property owner both sign a written construction contract and the property owner refuses the offered warranty, the contractor may withdraw the offer to construct the structure or dwelling.
Subsection (1) of this section does not apply to a residential structure that is a manufactured dwelling as defined in ORS 446.003.
Official sources · 2Tap to view provenance and version history
Provenance
2023 Oregon Revised Statutes
Official online edition
- Source
- oregonlegislature.gov
- SHA-256
1dbce597…81f224c3- Review
- auto verified
Version history
Prior statutory text is not available in the ingested published editions. Consult an earlier official ORS edition or the cited Oregon Laws chapter.
2025 Oregon Revised Statutes — official online source · active · operative text
Official source2023 Oregon Revised Statutes · active · operative text
Official source