Chapter 758 — Utility Rights of Way and Territory Allocation; Cogeneration

74 sections

758.010 Authority to construct lines and facilities; requirements and conditions

Except within cities, any person has a right and privilege to construct, maintain and operate its water, gas, electric or communication service lines, fixtures and other facilities along the public roads in this state, as defined in ORS 368.001 or across rivers or over any lands belonging to state government, as defined in ORS 174.111, free of charge, and ov…

758.012 Notice of intent to build transmission line to consumer-owned utilities and public utilities; exemptions

As used in this section: “Public utility” has the meaning given that term in ORS 757.005. “Transmission line” means a linear utility facility by which a utility provider transmits or transfers electricity from a point of origin or generation or between transfer stations. A person who applies for a permit with the Energy Facility Siting Council or with a c…

758.013 Operator of electric power line to provide Public Utility Commission with safety information; availability of information to public utilities

Each person who is subject to the Public Utility Commission’s authority under ORS 757.035 and who engages in the operation of an electric power line as described in ORS 757.035 must provide the commission with the following information before January 2 of each even-numbered year: The name and contact information of the person that is responsible for the ope…

758.015 Certificate of public convenience and necessity

When any person, as defined in ORS 758.400, providing electric utility service, as defined in ORS 758.400, or any transmission company, proposes to construct an overhead transmission line which will necessitate a condemnation of land or an interest therein, it shall petition the Public Utility Commission for a certificate of public convenience and necessity …

758.017 Appeal of grant or denial of certificate of public convenience and necessity for transmission lines subject to Energy Facility Siting Council approval; review vested in Supreme Court

Any party to a contested case hearing related to the application for a certificate of public convenience and necessity under ORS 758.015 for a proposed transmission line for which the petitioner also seeks approval from the Energy Facility Siting Council for the same transmission line may appeal the Public Utility Commission’s grant or denial of the applicat…

758.020 Joint occupancy of poles

The county court, board of county commissioners or the Department of Transportation, when designating the location where poles or other aboveground facilities described in ORS 758.010 may be placed on a road or highway which fronts on the ocean or on a river or other body of water and the water frontage of the highway is being developed or maintained for its…

758.025 Relocation of utilities in highway right of way; required consultation; recovery of costs

As used in this section: “Highway” has the meaning given that term in ORS 801.305 (1) but does not include highways located on property owned by the Port of Portland that is subject to federal relocation regulations authorized under 49 U.S.C. 47107, as in effect on January 1, 2010. “Public body” has the meaning given that term in ORS 174.109. “Utility” me…

758.030 [Renumbered 271.440]

758.035 Commission’s power to enforce joint use of facilities

Every public utility, telecommunications utility, person, association or corporation having conduits, subways, street railway tracks, poles or other equipment on, over or under any street or highway shall for a reasonable compensation permit the use of the same by any public utility or telecommunications utility whenever public convenience or necessity requi…

758.040 [Renumbered 757.606]

758.050 [Renumbered 757.611]

758.060 [Amended by 1971 c.743 §426; renumbered 757.616]

758.070 [Renumbered 757.621]

758.080 [Renumbered 757.626]

758.090 [Renumbered 757.631]

758.100 [Renumbered 757.636]

758.110 [Renumbered 757.641]

PROVISION OF BROADBAND SERVICES BY ELECTRIC COOPERATIVE

758.120 Electric easement in provision of broadband services; exceptions; notice; remedies for property owners

As used in this section and ORS 758.125 and 758.130: “Attachment” has the meaning given that term in ORS 757.270. “Broadband” has the meaning given that term in ORS 276A.406. “Commercial broadband service provider” means a provider of broadband service that is not affiliated with or a division of an electric cooperative. “Electric cooperative” has the me…

758.125 Duties and rights not altered by ORS 758.120

ORS 758.120 does not alter the rights of an electric cooperative or commercial broadband service provider to acquire the rights to use real property for broadband services through any other means authorized by law. ORS 758.120 does not authorize an expanded use that is expressly prohibited by the terms of a written electric easement. Exercise of the author…

758.130 Requirements for electric cooperative in provision of broadband services; audit; compliance

An electric cooperative that exercises the authority granted under ORS 758.120 for the provision of broadband services: For as long as the electric cooperative maintains an exclusive right to provide electric service to customers within its exclusive service territory, may provide broadband service only through a broadband affiliate or through a separate br…

758.210 Policy

The legislature finds that in many areas of this state landowners, utilities and public authorities desire to convert existing overhead electric and communication facilities to underground facilities by means of special assessment proceedings. The legislature declares that a public purpose will be served and that the public welfare will be promoted by provid…

758.215 Definitions for ORS 758.210 to 758.270

As used in ORS 758.210 to 758.270, unless the context requires otherwise: “Convert,” “converting” or “conversion” means the removal of overhead electric or communication facilities and the replacement thereof with underground electric or communication facilities at the same or different locations. “Electric or communication facilities” means any works or i…

758.220 Authority for conversion to underground facilities; formation of assessment district

A public authority shall have the power to require the conversion of overhead electric or communication facilities to underground facilities; to provide and receive funds to pay for such conversion; and to assess the whole or any part of the cost thereof against the real property included in the underground assessment district specially benefited by such con…

758.225 Petition, ordinance or resolution for conversion; contents; filing

A proceeding for conversion may be initiated: By a petition signed by not less than 60 percent of the landowners within the proposed assessment district who own not less than 60 percent of the land area within the district; or By an ordinance or resolution of a public authority declaring its intention to order a conversion. A petition shall: Describe the…

758.230 Assessment procedure; objections to conversion

Upon presentation of the petition and certificate of sufficiency, or upon adoption of an ordinance or resolution, the public authority shall proceed in the manner provided by ORS 223.389. Unless the charter of a county provides otherwise, a county shall declare a proposed conversion abandoned if, after notice as provided by ORS 223.389, objections to the co…

758.235 Applicability of local improvement laws; issuance of bonds

Unless otherwise provided by ORS 758.210 to 758.270, the provisions relating to the procedure for local improvements in cities, as set forth in ORS 223.205, 223.210 to 223.295, 223.387 to 223.399, 223.401, 223.405 to 223.485, 223.505 to 223.595, 223.610, 223.615 to 223.650 and 223.770, apply to proceedings for a conversion by a city or county under ORS 758.2…

758.240 Contract with utility for conversion

When a public authority in accordance with ORS 758.230 determines that a conversion shall be made, it may contract with the utilities supplying electric or communication service within the underground assessment district to perform the conversion. A contract shall provide: A description of the electric and communication facilities to be converted; That pla…

758.245 Payment of costs for conversion; removal of overhead facilities

Upon completion of the conversion of the overhead electric or communication facilities on public lands and right of way to underground, the affected utility shall file a verified statement of the costs of such conversion with the public authority. The public authority shall adopt an ordinance assessing the whole or any part of the cost of the conversion agai…

758.250 Conversion of facilities on private lands; procedure; payment of costs

Any conversion of electric or communication service facilities, including service connections, located on a privately owned lot or parcel shall be made at the expense of the landowner by the utility owning the facility. The conversion shall be made in accordance with applicable safety rules, codes, regulations, tariffs or ordinances. The utility shall not be…

758.255 Discontinuance of utility service for noncompliance with conversion provisions

If the owner of any structure or improvement served from the overhead electric or communication service facilities within an underground assessment district does not grant the utility a permit or easement referred to in ORS 758.250 or if such an owner fails to convert to underground service facilities within 90 days after the mailing to the owner of the noti…

758.260 Competitive bidding for utility conversion

To the extent that the contract between the utility and the public authority provides that all or any part of the conversion work shall be performed by the utility, any statute or charter provision requiring competitive bidding and the award of a contract to the lowest responsible bidder does not apply.

758.265 Overhead facilities in assessment district after conversion

Once converted, no overhead electric or communication facilities shall be installed, maintained or operated in any underground assessment district except as authorized by ORS 758.210 to 758.270.

758.270 Effect of ORS 758.210 to 758.270 on existing laws and rights

ORS 758.210 to 758.270 are supplemental and cumulative of existing rights, laws, charters, ordinances and franchises and shall not abrogate or modify any franchise granted to a utility by any local government or abrogate or modify in any way existing rights, laws, charters or ordinances of any local government. LIABILITY OF ELECTRIC UTILITY FOR PRUNING AND …

758.280 Definitions for ORS 758.280 to 758.286

For the purposes of ORS 758.280 to 758.286: “Electric facilities” means lines, conduits, ducts, poles, wires, pipes, conductors, cables, crossarms, receivers, transmitters, transformers, instruments, machines, appliances and all other devices and apparatuses used, operated, owned or controlled by an electric utility for the purposes of manufacturing, transf…

758.282 Immunity of electric utility for pruning or removing vegetation in certain cases

An electric utility is immune from any civil liability for pruning or removing vegetation that is growing on property on which electric facilities are located, or growing on property that is adjacent to property on which electric facilities are located, if the pruning or removal is consistent with policies of the Public Utility Commission relating to the pru…

758.284 Immunity of electric utility for pruning or removing vegetation in other cases; notice to property owner

An electric utility is immune from any civil liability for pruning or removing vegetation that is growing on property on which electric facilities are located, or growing on property that is adjacent to property on which electric facilities are located, if the pruning or removal is consistent with policies of the Public Utility Commission relating to the pru…

758.286 Immunity not applicable to liability for cost of abating fires

The immunities provided by ORS 758.280 to 758.284 do not affect any liability that an electric utility may have for the costs of abating fires under ORS 477.064 to 477.120. Note: See note under 758.280. WATER UTILITIES

758.300 Definitions for ORS 758.300 to 758.320

As used in ORS 758.300 to 758.320: “Commission” means the Public Utility Commission. “Community water supply system” means a water source and distribution system, whether publicly or privately owned, that serves more than three residences or other users to whom water is provided for public consumption, including but not limited to schools, farm labor camps…

758.302 Application for exclusive service territory; hearing on application; notice

A water utility may apply to the Public Utility Commission for an order designating an area as an exclusive service territory for the water utility. The commission may designate as an exclusive service territory any area that on the date of application is being served in an adequate manner by the applicant and is not being served by any other water provider.…

758.305 Exclusive service territories

Designated service territories of a water utility approved by the Public Utility Commission shall be exclusive. A water utility or community water supply system shall not provide water utility service within the designated exclusive service territory of another water utility without the express approval of the commission. A water utility shall serve only cu…

758.310 Assignment or transfer of rights in exclusive service territory; approval of commission

The rights acquired by the designation of an exclusive service territory may be assigned or transferred only with the approval of the Public Utility Commission after a finding that the assignment or transfer is in the public interest. However, a hearing is not required if at least 75 percent of the affected customers agree to the proposed assignment or trans…

758.315 Water utility service provided by persons not designated by commission; remedy

In the event a designated exclusive service territory is served by a person not authorized by the Public Utility Commission, the commission or the water utility designated by the commission to serve the area may file an action for injunctive relief in the circuit court for any county where some or all of the designated service territory is located. The actio…

758.320 Application of ORS 758.300 to 758.320 to cities; effect on certain voluntary associations; existing franchise; exception

The provisions of ORS 758.300 to 758.320 shall not be construed to restrict the powers granted to cities to issue franchises or to restrict the powers of condemnation of a municipality. The provisions of ORS 758.300 to 758.320 shall not be construed to restrict the formation of homeowners associations pursuant to ORS chapter 94, cooperatives pursuant to ORS…

758.400 Definitions for ORS 758.015 and 758.400 to 758.475

As used in ORS 758.015 and 758.400 to 758.475 unless the context requires otherwise: “Allocated territory” means an area with boundaries established by a contract between persons furnishing a similar utility service and approved by the Public Utility Commission or established by an order of the commission approving an application for the allocation of terri…

758.405 Purpose of ORS 758.400 to 758.475

The elimination and future prevention of duplication of utility facilities is a matter of statewide concern; and in order to promote the efficient and economic use and development and the safety of operation of utility services while providing adequate and reasonable service to all territories and customers affected thereby, it is necessary to regulate in th…

758.410 Contracts for allocation of territories and customers; transfer of facilities

Any person providing a utility service may contract with any other person providing a similar utility service for the purpose of allocating territories and customers between the parties and designating which territories and customers are to be served by which of said contracting parties; and the territories and customers so allocated and designated may inclu…

758.415 Enforceability of contract approved by commission; conditions for approval

Notwithstanding any other provisions of law, a contract entered into pursuant to ORS 758.410, when approved by the Public Utility Commission as provided in ORS 758.420 to 758.475, shall be valid and enforceable; provided, that the commission shall approve such a contract only if the commission finds, after a hearing as provided in ORS 758.420 to 758.475, tha…

758.420 Filing of contract; hearing on contract; notice

A person who enters into a contract pursuant to ORS 758.410 shall promptly file the contract with the Public Utility Commission. A contract filed under this section must include a copy of the notice of the filing to be given to all customers of record, and the person shall, within 30 days after filing a contract under this section, give notice of the filing …

758.425 Order of commission on contract

On the basis of the applicant’s filing or, if there is a hearing, on the record made at the hearing held pursuant to ORS 758.420, the Public Utility Commission shall enter an order either approving or disapproving the contract as filed, together with any appropriate findings of the facts supporting such order. An order of the commission under this section i…

758.430 Amendment of contract; approval of commission

Any contract that has been approved as provided in ORS 758.400 to 758.475 may be subsequently amended by the parties thereto, but any such amendatory agreement shall be filed with the Public Utility Commission and shall thereafter be approved or disapproved by the commission in the manner provided in ORS 758.420 and 758.425. However, no hearing is required i…

758.435 Application for allocation of territory; hearing on application; notice

Any person providing a utility service in a territory that is not served by another person providing a similar utility service may file an application with the Public Utility Commission for an order allocating such territory to the person providing the utility service. The application may include any adjacent area when it is more economical and feasible to s…

758.440 Order of commission on application

On the basis of the application, or, if there is a hearing, on the record made at the hearing held pursuant to ORS 758.435, the Public Utility Commission shall enter an order either approving or disapproving the application as filed, or as amended, together with findings of the facts supporting such order. The commission, before approving an application for…

758.445 Judicial review of order on application

An order of the Public Utility Commission under ORS 758.440 is subject to judicial review in the manner provided by ORS 756.610. If a petition for judicial review is not filed within the specified time, the order shall thereafter be valid and enforceable for the purposes herein specified from the date on which the right to file a petition for judicial review…

758.450 Contract required for allocation of territory; prohibited activities; exceptions; third party financing

Territory served by more than one person providing similar utility service may only become an allocated territory by a contract approved by the Public Utility Commission. Except as provided in subsection (4) of this section, no other person shall offer, construct or extend utility service in or into an allocated territory. Except as provided in subsection …

758.455 Investigation by commission respecting contracts or applications; hearing procedure

The Public Utility Commission may make such investigations respecting a contract or an application for the allocation of territory as the commission deems proper including the physical examinations and evaluations of the facilities and systems of the parties to the contract, estimates of their operating costs and revenues and studies of such other informatio…

758.460 Assignment or transfer of rights acquired by allocation; approval of commission

The rights acquired by an allocation of territory may only be assigned or transferred with the approval of the Public Utility Commission after a finding that such assignment or transfer is not contrary to the public interest. However, no hearing is required if all affected customers agree to the proposed assignment or transfer. No approved contract or order…

758.465 Enforcement procedure

In the event a contract approved by the Public Utility Commission is breached or in the event an allocated territory is served by a person not authorized by such contract, or order of the commission, the aggrieved person or the commission may file an action in the circuit court for any county in which is located some or all of the allocated territory alleged…

758.470 Application to cities, municipalities and cooperatives of ORS 758.400 to 758.475

ORS 758.015 and 758.400 to 758.475 shall not be construed or applied to restrict the powers granted to cities to issue franchises, or to restrict the exercise of the power of condemnation by a municipality; and when a municipality has condemned or otherwise acquired another person’s equipment, plant or facilities for rendering utility service, it shall acqui…

758.475 Fees

Except in cases under ORS 758.430 and 758.460 where no hearing is required, to cover the costs of administering ORS 758.015 and 758.400 to 758.475 the Public Utility Commission is required to receive fees before filing any contract, application, petition, complaint, protest, appearance, motion, answer or other pleading and for holding any hearing. All fees s…

758.480 Assumption of obligations arising out of Trojan Nuclear Plant

As used in this section: “Agreement” means the agreement dated October 5, 1970, and titled “Agreement for Construction, Ownership and Operation of the Trojan Nuclear Plant,” as amended. “Allocated territory” has the meaning given that term in ORS 758.400. “Person” means: A person as defined in ORS 174.100; A person as defined in ORS 758.400; A public b…

758.500 [1979 c.730 §2; 1981 c.714 §1; repealed by 1981 c.714 §5 and by 1983 c.799 §9]

COGENERATION AND SMALL POWER PRODUCTION FACILITIES

758.505 Definitions for ORS 758.505 to 758.555

As used in ORS 758.505 to 758.555: “Avoided cost” means the incremental cost to an electric utility of electric energy or energy and capacity that the utility would generate itself or purchase from another source but for the purchase from a qualifying facility. “Cogeneration facility” means a facility that: Produces, through the sequential use of energy, …

758.510 [1979 c.730 §3; 1981 c.714 §2; repealed by 1981 c.714 §7 and by 1983 c.799 §9]

758.515 Legislative findings

The Legislative Assembly finds and declares that: The State of Oregon has abundant renewable resources. It is the goal of Oregon to: Promote the development of a diverse array of permanently sustainable energy resources using the public and private sectors to the highest degree possible; and Insure that rates for purchases by an electric utility from, an…

758.520 [1979 c.730 §4; 1981 c.714 §3; repealed by 1981 c.714 §9 and by 1983 c.799 §9]

758.525 Avoided cost schedules; filing; requirement to purchase energy from qualifying facilities

At least once every two years each electric utility shall prepare, publish and file with the Public Utility Commission a schedule of avoided costs equaling the utility’s forecasted incremental cost of electric resources over at least the next 20 years. Prices contained in the schedules filed by public utilities shall be reviewed and approved by the commissio…

758.530 [1979 c.730 §5; 1981 c.714 §4; repealed by 1981 c.714 §11 and by 1983 c.799 §9]

758.535 Criteria for qualifying facility; terms and conditions of energy sale

The Public Utility Commission shall establish minimum criteria that a cogeneration facility or small power production facility must meet to qualify as a qualifying facility under ORS 543.610, 757.005 and 758.505 to 758.555. The terms and conditions for the purchase of energy or energy and capacity from a qualifying facility shall: Be established by rule by…

758.540 [1979 c.730 §6; repealed by 1981 c.714 §13]

758.545 Electric utility required to make good faith effort to transmit energy; remedy

If an electric utility fails to make a good faith effort to comply with a request from a qualifying facility to transmit energy or energy and capacity produced by the qualifying facility to another electric utility or to the Bonneville Power Administration, the electric utility shall purchase the qualifying facility’s energy or energy and capacity at a price…

758.550 [1979 c.730 §7; repealed by 1983 c.799 §9]

758.552 Ownership of renewable energy certificates for energy generated by qualifying facility

For contracts executed pursuant to the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.) and in effect prior to November 30, 2005, renewable energy certificates created pursuant to a system established by the State Department of Energy under ORS 469A.130, for generation during the term of such a contract, are owned by the owner of a qua…

758.555 Effect of energy sales on qualifying facility

A qualifying facility shall not become a public utility within the meaning of ORS 757.005 on account of sales made under ORS 543.610, 757.005 and 758.505 to 758.555.

758.990 [Renumbered 757.992]