Chapter 758 — Utility Rights of Way and Territory Allocation; Cogeneration
ORS 758.545 Electric utility required to make good faith effort to transmit energy; remedy
If an electric utility fails to make a good faith effort to comply with a request from a qualifying facility to transmit energy or energy and capacity produced by the qualifying facility to another electric utility or to the Bonneville Power Administration, the electric utility shall purchase the qualifying facility’s energy or energy and capacity at a price which is the higher of:
The electric utility’s avoided cost; or
The index rate.
As used in this section, “good faith effort” shall be demonstrated by the electric utility’s publication of a generally applicable, reasonable policy of the electric utility to allow a qualifying facility to use the electric utility’s transmission facilities on a cost-related basis.
Official sources · 1Tap to view provenance details
Provenance
2025 Oregon Revised Statutes — official online source
Official online edition
- Source
- oregonlegislature.gov
- SHA-256
5aa02f4a…ba9784a7- Review
- auto verified
Version history
2025 Oregon Revised Statutes — official online source