Chapter 758 — Utility Rights of Way and Territory Allocation; Cogeneration
ORS 758.013 Operator of electric power line to provide Public Utility Commission with safety information; availability of information to public utilities
Each person who is subject to the Public Utility Commission’s authority under ORS 757.035 and who engages in the operation of an electric power line as described in ORS 757.035 must provide the commission with the following information before January 2 of each even-numbered year:
The name and contact information of the person that is responsible for the operation and maintenance of the electric power line, and for ensuring that the electric power line is safe, on an ongoing basis; and
The name and contact information of the person who is responsible for responding to conditions that present an imminent threat to the safety of employees, customers and the public.
In the event that the contact information described in subsection (1) of this section changes or that ownership of the electric power line changes, the person who engages in the operation of the electric power line must notify the commission of the change as soon as practicable, but no later than within 90 days.
If the person described in subsection (1) of this section is not the public utility, as defined in ORS 757.005, in whose service territory the electric power line is located, the commission shall make the information provided to the commission under subsection (1) of this section available to the public utility in whose service territory the electric power line is located.
Official sources · 1Tap to view provenance details
Provenance
2025 Oregon Revised Statutes — official online source
Official online edition
- Source
- oregonlegislature.gov
- SHA-256
5aa02f4a…ba9784a7- Review
- auto verified
Version history
2025 Oregon Revised Statutes — official online source