Chapter 701 — Construction Contractors and Contracts
ORS 701.320 Offer of warranty; withdrawal of contract offer
A contractor that enters into a contract to construct a new residential structure or zero-lot-line dwelling, or to sell a new residential structure or zero-lot-line dwelling constructed by the contractor, shall make a written offer to the property owner or original purchaser of the structure or dwelling of a warranty against defects in materials and workmanship for the structure or dwelling. The property owner or original purchaser of the structure or dwelling may accept or refuse the offer of a warranty by the contractor. If a contractor makes the written offer of a warranty before the contractor and the property owner both sign a written construction contract and the property owner refuses the offered warranty, the contractor may withdraw the offer to construct the structure or dwelling.
Subsection (1) of this section does not apply to a residential structure that is a manufactured dwelling as defined in ORS 446.003.
Official sources · 1Tap to view provenance details
Provenance
2025 Oregon Revised Statutes — official online source
Official online edition
- Source
- oregonlegislature.gov
- SHA-256
1795680e…503dbac7- Review
- auto verified
Version history
2025 Oregon Revised Statutes — official online source